H
OME
C
HI
S
IAMO
Q
UALITA’ &
P
OLICY
C
OMPETENZE
Post-trenching condotte
Post-trenching atterraggio
Back-filling
Survey per Decomissioning
Interramento Cavi
Sistema Pulling
A
TTREZZATURE
Post-trenching condotte (PTM)
Macchine interramento cavi
Verricello lineare
Macchina Back-filling
L
A
N
OSTRA
E
SPERIENZA
C
ONTATTI
Burial of cables and flexibles
MADE ISLAND, MYANMAR, BENGALA GULF
PROJECT
MYANMAR PROJECT
PRODUCT
OPTICAL CABLE
LENGTH (m)
4463
CLIENT/CONTRACTOR
PUNJ LLOYD/DHARTI DREDGING AND INFRASTRUCTURE LIMITED
YEAR
2012/2013
Progetto
Post-Trenching
MADE ISLAND, MYANMAR, BENGALA GULF
PROJECT
MYANMAR PROJECT
PRODUCT
40" - 32"
LENGTH (m)
9032
CLIENT/CONTRACTOR
PUNJ LLOYD/DHARTI DREDGING AND INFRASTRUCTURE LIMITED
YEAR
2012/2013
Progetto